Wapakoneta WTP (CMAR)
- Owner: City of Wapakoneta
- Contract Type: Construction Manager at Risk
- Contract Value: $18.2 Million
- Completion: September 2023
The City of Wapakoneta selected PCC as CMAR for an $18.2 million lime-softening conversion upgrade at their WTP. The project scope included conversion of the existing ion exchange softening WTP to a lime softening WTP. Components of the project included relocation of existing aerators, a new carbon dioxide feed building complete with a pressurized solution feed (PSF) carbon dioxide feed system, (2) new solids contact clarifiers, conversion of existing tankage to a recarbonation basin, a new chemical building with lime and soda ash feed systems, a new clearwell, and conversion of space within the existing treatment building to administrative areas. Work also included the construction of two lime sludge storage lagoons.
